Sources and calculation methods

Use this register to trace a result back to its equation or table and see which parts depend on site evidence or website assumptions. Page references are the printed pages of the 2015 SuDS Manual. National guidance is identified by jurisdiction. Overseas research is included where it explains a method’s origin.

References reviewed 23 November 2026. Online guidance and regulator conditions can change.

Water quality — hazards and treatment trains

Woods Ballard, B., Wilson, S., Udale-Clarke, H., Illman, S., Scott, T., Ashley, R. and Kellagher, R. (2015). The SuDS Manual. CIRIA C753, London. ISBN 978-0-86017-759-3.

Hazard and mitigation indices

Section 26.7.1, Box 26.2 and Tables 26.2–26.4 (printed pp. 567–571) supply the adopted method. Compare mitigation with hazard independently for suspended solids, metals and hydrocarbons on each connected route. For two different treatment stages CIRIA discounts the second index by half. The website credits up to two eligible stages. Its routing percentages allocate contributing area and its evidence checks decide whether to credit a component. An index of 0.7 is a screening score and cannot be read as 70% pollutant removal.

Earlier surface-water method

CIRIA explicitly credits Ellis, J.B., Revitt, D.M. and Lundy, L. (2012). An impact assessment methodology for urban surface runoff quality following best practice treatment. Science of the Total Environment 416, 172–179. Annex 5 (p. 591) describes their multiplicative residual-risk approach. CIRIA changed the comparison and scoring direction. Cite Ellis for the antecedent and C753 for the numbers and series rule used here. Section 26.6 and Annexes 1–3 describe the monitoring evidence and variability behind CIRIA’s judgement.

Groundwater protection

Table 26.4, notes 1–4, and section 25.2.2 give the soil and groundwater conditions. Chapter 26 Annex 4 reviews Scott Wilson (2010), Fate of highway contaminants in the unsaturated zone, final synthesis report, Highways Agency, and Jefferies, C., Napier, F., Fogg, P. and Nicholson, F. (2008), Source control pollution in sustainable drainage, SNIFFER UEUW01. See also Jefferies and Napier (2008), SuDS pollution degradation, SNIFFER final report UEUW02. These studies inform the assessment of attenuation in soil. The tabulated indices come from CIRIA. The website’s dual-receptor screen checks the full route against both receptors as a precaution.

Water quality — component calculations

Filter strips

C753 §§15.4–15.5, Eq. 15.1, pp. 293–295. The tool solves wide sheet flow using Manning’s relationship, then divides length by velocity to obtain travel time. Claytor, R. and Schueler, T. (1996), Design of Stormwater Filtering Systems, Center for Watershed Protection, supports short strips at shallow slopes. Barrett, M., Lantin, A. and Austrheim-Smith, S. (2004). Storm Water Pollutant Removal in Roadside Vegetated Buffer Strips. Transportation Research Record 1890, 129–140. California Department of Transportation (2003), Roadside Vegetated Treatment Sites Study, final report CTSW-RT-03-028, is the source CIRIA discusses for cover, slope and length together. A single cover or slope flag cannot reproduce those site conditions. Section 15.4 recommends 1–5% for general design.

Swales and detention basins

C753 §§17.4 and 24.11.1: Q = A R2/3 S1/2 / n. For the swale the tool solves for depth using trapezoidal geometry, obtains velocity from Q/A, and calculates travel time as L/v. Section 17.4 gives 9 minutes, or 18 minutes for the stated lateral-inflow case. Figure 17.7 attributes depth-dependent roughness to Wong, T.H.F. (ed., 2006), Australian Runoff Quality: A Guide to Water Sensitive Urban Design, Engineers Australia. This figure concerns roughness. The timing criteria are attributed to C753. For the basin, §22.5 is the treatment basis and the designer supplies modelled velocity and depth.

Bioretention

C753 §18.4.1, Eq. 18.1, p. 342. Darcy flow through a bed gives A = V L / [k (L + h) t]. The tool uses average ponding head h equal to half maximum depth. The accompanying text specifies designing with 50% of the measured compacted-medium conductivity. These are two separate factors. Comparing surface ponding volume with treatment volume is an additional website check. FAWB (2009), Stormwater Biofiltration Systems: Adoption Guidelines, version 1, Monash University, ISBN 978-0-98058-311-3, informs media and performance guidance in chapter 18. The underlying law comes from Darcy, H. (1856). Les fontaines publiques de la ville de Dijon. Paris: Dalmont. C753 gives no explicit earlier author beside Eq. 18.1.

Ponds and wetlands

C753 §23.5 relates permanent pool size to 10–15 mm of rainfall over the contributing catchment, drawing on Lampe, L., Barrett, M., Woods Ballard, B., Martin, P., Glass, C., Weinstein, N. and Jefferies, C. Post-Project Monitoring of BMPs/SUDS to Determine Performance and Whole-Life Costs. IWA Publishing. C753 cites 2003. The Water Research Foundation catalogues the report in 2004. The tool multiplies contributing area by 0.010 and 0.015 m. Its lower-bound screen is separate from C753’s Scotland-specific Eq. 23.1, which the tool does not solve. Section 23.2 and Table 26.3 notes 3–4 qualify flow path, forebay and wetland credit.

Storage, flow and product checks

Chapters 11–16, 20 and 25 give the component context. The website calculates bulk void storage as plan area × effective depth × available void fraction. Event runoff is contributing area × rainfall depth × runoff fraction. A nominal surface intake in L/s is area (m²) × measured rate (mm/h) / 3,600. Roof storage uses available substrate porosity. Tank drawdown in days is usable litres / daily demand. These are geometric or dimensional checks. Measured rates, demand, site routing, event depths and product ratings need a project reference. Proprietary indices require independent product-specific evidence under chapters 14 and 26.

Trial-pit infiltration tests

Building Research Establishment (2016). Soakaway design, BRE Digest 365, 2016 revision. ISBN 978-1-84806-438-6.

C753 §25.3 references the 1991 BRE Digest. The trial-pit tool identifies the 2016 revision. For a rectangular pit of length L, width W and initial effective water depth H, the volume lost between 75% and 25% is 0.5 L W H. Wetted area at half depth includes the base and four walls: L W + (L + W) H. Divide the lost volume by wetted area and elapsed seconds to obtain m/s. The website interpolates the two crossing times between adjacent readings and leaves the rate blank if either crossing is missing. C753 §25.3 (p. 549) explicitly calls for three fills of the test pit. Each fill has its own rate. Repeat comparisons and the designer’s adopted rate are reported separately.

First 5 mm and planning evidence

Department for Environment, Food & Rural Affairs (2025). National standards for sustainable drainage systems. England.

C753 §24.8, Box 24.3 and Table 24.6 explain the earlier interception concept. Box 24.3 illustrates a summer evaporative loading ratio by comparing about 90 mm of monthly evaporation with 29 mm of effective runoff. Those illustrative climate assumptions are separate from the site inputs. Standard 2, especially clauses 2.1–2.7, supplies the interception objective, seasonal criteria and component-specific area-loading rules. For each eligible route the checklist calculates 5 mm volume as A × 0.005 m, maximum additional area as eligible receiving area × applicable loading ratio, and required receiving area by dividing by that ratio. The tool identifies the applicable clause by feature. Mapping each contributing area once and checking evidence references are website controls.

The planning submission writer combines the supplied SuDS Overall Compliance Checklist workbook and the Environment Agency-commissioned major and non-major SuDS Strategy Templates, revision 1.0. The submitted results are the applicant’s own calculations. Each topic lists the corresponding source section. Planning Portal – drainage strategy and template publication page. Planning practice guidance – Flood risk and coastal change (England).

Natural flood management calculator

Routing, storage and outlets

US Army Corps of Engineers, Hydrologic Engineering Center. HEC-HMS Technical Reference Manual, Reservoir Modeling Concepts and Equations. Conservation of volume provides the routing basis. The website uses its own backward-Euler solution, bisection, capacity bypass and assumed inflow split. Storage uses constant plan area × depth, triangular backwater-wedge volume b h²/(2s), or a trapezoidal cell L(bh + zh²). The orifice law Q = Cda√(2gh) represents an equivalent free outlet. USACE HEC-HMS Technical Reference Manual, Reservoir Modeling, Outlets (orifice equation). The 10 mm shallow-depth taper on infiltration is a website modelling choice. Opening area, discharge coefficient, surveyed geometry and measured losses need site evidence.

Land management and percentages

USDA Natural Resources Conservation Service (2004). National Engineering Handbook, Part 630 Hydrology, chapter 10, Estimation of Direct Runoff from Storm Rainfall. The runoff-depth method uses retention S = 25400/CN − 254 mm and initial abstraction λS, conventionally λ = 0.20. Scaling the affected share of the baseline hydrograph by the ratio of runoff depths is the website’s sensitivity scenario. Peak reduction is 100 × (baseline peak − proposed peak) / baseline peak. Event loss divides lost volume by inflow volume and storage use divides maximum stored volume by capacity. The Environment Agency’s 2025 NFM evidence directories provide context for choosing measures. The percentages are calculated for the entered event.

Maintenance plans

Woods Ballard et al. (2015), C753, component maintenance tables, printed pagination. Task descriptions and frequencies in the writer are adapted from these schedules. The operator records local changes and product-specific instructions.

  • Rainwater harvesting — Table 11.6, p. 229
  • Green roof — Table 12.5, p. 252
  • Soakaway — Table 13.1, p. 267
  • Infiltration basin — Table 13.2, p. 268
  • Proprietary treatment system — Table 14.2, p. 287
  • Filter strip — Table 15.1, p. 299
  • Filter drain — Table 16.1, p. 310
  • Swale — Table 17.1, p. 329
  • Bioretention / rain garden — Table 18.3, p. 357
  • SuDS tree pit / planter — Table 19.3, p. 382
  • Pervious / permeable pavement — Table 20.15, p. 430
  • Attenuation storage tank — Table 21.3, p. 468
  • Detention basin — Table 22.1, p. 483
  • Pond / wetland — Table 23.1, p. 502

Construction water plans

GPP 6 supports site controls. RPS 261 is an England-specific regulatory position. The printed plan records decisions, deadlines and evidence entered by the contractor.

Watercourse silt management

The planning prompts follow SEPA’s sequence for isolation, dewatering, treatment and reinstatement. The designer supplies treatment capacity and monitoring triggers for the reach.

Invasive plants and INNS plans

Use the identification sheets for field characteristics and the management guidance for control and follow-up. The plan records patch-specific decisions and observations.

Watercourse maintenance

National guidance, legislation and public services cited by the watercourse guide.

Road gullies

National reporting services used by the guide. The relevant road authority investigates the local asset.

Flooding, SuDS and catchment guides

Culvert design and consent

Open the guide and statement writer. The only calculated result is proposed headwater minus existing headwater for a common scenario, location and vertical datum. Levels come from the consultant’s referenced analysis. Each authority sets its applicable criteria.

  1. Land Drainage Act 1991, section 23 (as amended)

    Statutory starting point for erecting a culvert or altering one in a way likely to affect ordinary watercourse flow. Confirm the application route for temporary works too.

  2. Environment Agency. Owning a watercourse (England)

    Identify the relevant risk management authority. Record the permit or consent discussion before finalising the design.

  3. Environment Agency. Statutory Main River Map (England)

    Check the designation at the actual crossing. Watercourse size or appearance is an unreliable guide.

  4. Association of Drainage Authorities. Internal Drainage Boards directory

    Find the board, then verify the district boundary, local byelaws and access requirements with it.

  5. Natural Resources Wales. Main rivers

    Check designation in Wales. Main river works follow the relevant NRW permitting route.

  6. Natural Resources Wales. Apply for land drainage consent

    NRW handles ordinary watercourse consents within Welsh internal drainage districts. Elsewhere on ordinary watercourses check with the LLFA.

  7. Benn, J., Kitchen, A., Kirby, A., Fosbeary, C., Faulkner, D., Latham, D. and Hemsworth, M. (2019). Culvert, screen and outfall manual. CIRIA C786. ISBN 9780860178910.

    UK whole-life technical reference covering design, operation and ownership. Supersedes C689 and the earlier Environment Agency trash and security screen guide.

  8. Environment Agency. Flood estimation guidelines

    Document the source, choice and checks on design flows, including uncertainty.

  9. Environment Agency. Using modelling for flood risk assessments

    Technical context for model extent, boundary conditions, baseline comparison and sensitivity. Agree a proportionate scope with the consenting body.

  10. Environment Agency. Flood risk assessments: climate change allowances (England)

    Record the purpose, catchment, allowance, epoch and lifetime. Use the guidance applicable to the project and jurisdiction.

  11. FHWA (2012). Hydraulic Design of Highway Culverts, third edition, HDS 5, FHWA-HIF-12-026

    Technical source for inlet and outlet control analysis. Check coefficients, shape, units and applicability when citing it. UK consenting criteria come from the relevant authority.

  12. Environment Agency. Blockage management guide, project SC110005 (completed 2019)

    Assess the source of debris, how likely it is to lodge, consequences and options for intervention. Evidence the blockage scenario selected for the site.

  13. SEPA. Engineering in the Water Environment: River Crossings, WAT-SG-25

    Technical reference for crossing options, bed continuity and fish passage. Scottish permitting rules have a separate territorial scope.