Watercourse silt management plan writer
Plan how to prevent, capture and monitor sediment during work in a watercourse, reach by reach.
Before you start
Bring the method statement, temporary works drawings, flow and weather information, discharge conditions, upstream baseline and downstream receptor map. Add a reach for each work area or phase whose controls change. Use alongside the construction water management plan.
Start by avoiding disturbance. Where work in the channel is necessary, record how clean flow will bypass the works, how dirty water will be collected and treated, and where it will go. Choose site-specific monitoring triggers. Base numerical limits on the agreed conditions or specialist advice. Record the reason if a control is inapplicable.
Choose controls for this reach
- Map the route from exposed soil and disturbed bed material to the first sensitive receptor. Consider access from the bank and staging works to reduce the area disturbed.
- Where isolation is proposed, record how flow will pass the work area and how wildlife, flood flows and overtopping will be managed. Have temporary works and ecological arrangements checked before installation.
- Keep clean flows separate. Trace pumped or silty water through the proposed treatment to its verified destination. Record the expected flow, particle size and capacity basis. Fine particles may pass through simple settlement.
- Compare upstream background with downstream observations during work and after rain. Set a named observer, stop trigger and notification route. If controls fail, pause the sediment-producing activity when safe, contain the source and record what must be checked before restarting.
- Remove accumulated sediment and temporary controls in an agreed sequence. Record how bed and bank levels, vegetation and downstream conditions will be checked after reinstatement.
National sources and scope
WAT-SG-29 provides technical good practice. For Scottish permission decisions use SEPA’s current water authorisations page. Elsewhere confirm requirements with the relevant national regulator and consenting authority.
Slow the Flow provides this free drafting tool. The contractor and appointed specialists retain responsibility for identification, design, permissions, safe working and review.
Your draft stays in this browser. Print or save a PDF for your project record.
Site record
Work reaches
Inspection log
Review and print
Issue with the referenced drawings and photographs. Open actions also appear in the printed plan.