Construction water management plan writer
Follow the water from each work area to its destination. Build a plan your site team can use as the works move on.
Before you start
Take a marked-up drainage drawing on a site walkover. Label work areas, routes, outfalls and nearby receptors. Bring the works programme, discharge correspondence, temporary works details and duty contacts. Issue the referenced drawings with the printed plan.
Add one phase for each change in drainage arrangements. Within it, add a route for each water source and destination. Include incoming clean water, muddy runoff, excavation water and washout where they occur. Record containment or off-site collection as the destination where appropriate.
National guidance and responsibility
Use the current advice for the nation where the site is located. The contractor and appointed professionals retain responsibility for verification, design, permissions and safe implementation. Slow the Flow provides this free drafting tool for the SuDS community.
- GPP 6 – Working at construction and demolition sites (see its territorial scope).
- Environment Agency – temporary dewatering, RPS 261 (England only, subject to conditions).
- National standards for SuDS (England).
- CIRIA C532 – Control of water pollution from construction sites.
Drafts are stored in this browser. Download a backup to keep a separate copy.
Site and walkover
Phases and water routes
Inspection log
Record the phase, route or control ID each time someone inspects it. Log outstanding repairs and return to record how they were closed.
Review and print
Use your browser’s print destination to save a PDF. The plan includes open actions. Review it with the responsible people before issue.