Slow the Flow

Tributary timing and combined peak

Compare how NFM changes the magnitude and timing of peak flow at a named downstream location.

Assessment record

Use a common event clock. Enter main-river flow at the comparison point excluding the tributary, and baseline and proposed tributary event flows at the upstream reference point. Include a common steady baseflow separately. Use observed or modelled time series from the same storm. For a timing-only test, repeat the baseline tributary column and apply a delay. If the proposed series already includes the NFM delay, enter zero additional delay.

Survey and event inputs

Results and plots

Free screening tool. The assessor retains responsibility for the survey, assumptions and interpretation.

Method and sources

Translate each tributary hydrograph by its travel time and add it to the main river and common baseflow at each instant. Linear interpolation and evaluation at every shifted or unshifted breakpoint yield the peak of each combined piecewise-linear hydrograph. Tied peaks report the first occurrence. Test earlier and later travel times for both scenarios, with a lower bound of zero. A positive reduction means a lower proposed peak; negative means a higher one. The translation preserves volume; attenuation must be evidenced in the supplied proposed series. Stage, backwater and flood extent require a separate hydraulic assessment.