NFM storage recovery between storms
Estimate how much flood storage is available when the next storm arrives, with a clear or restricted outlet.
Assessment record
Bring surveyed levels and plan areas, the water level when rainfall ceased, a level–discharge rating for the outlet, and an estimate of continuing inflow. Use the lowest usable operating level for the first row and the first spill crest for the last. Exclude the permanent pool and freeboard. Replace the illustrative values before using the assessment.
Survey and event inputs
Results and plots
Free screening tool. The assessor retains responsibility for the survey, assumptions and interpretation.
Method and sources
The level-pool water balance is change in volume = inflow minus outlet discharge and spill, integrated over time. Area and rated discharge vary linearly between entered levels; area is integrated to obtain volume. A backward Euler step of up to one minute solves for the new level. Restriction scales discharge at each level by the entered percentage. Inflow is held constant and water above the crest is counted as spill. Storage available is crest volume minus retained volume, expressed as a percentage of the surveyed active capacity. Include steps in the rating at changes in outlet behaviour. Tailwater changes, leakage and infiltration need site evidence and a suitable rating.