Road and embankment overtopping
Identify the first low point, wetted crest width and potential free overflow across a surveyed crest.
Assessment record
Replace all example numbers and identify their survey or event source. Use metres on one vertical datum. Survey along the crest across the potential flow path. Include each low point and extend to high ground at both ends. Record downstream levels and where bypass flow goes.
Survey and event inputs
Results and plots
Free screening tool. The assessor retains responsibility for the survey, assumptions and interpretation.
Method and sources
Assume steady free overflow perpendicular to a broad crest and negligible approach velocity. Integrate dQ = C × H^(3/2) dx over each straight survey segment, with H the positive upstream head above the local crest. Wetted width is horizontal width along the survey. The example coefficient is illustrative; select it for the surface and crest geometry. When downstream water covers the lowest crest, a drowned-flow assessment is needed and the tool withholds forward discharge. Waves, breaching, steep approach flow and erosion are outside this estimate.