Flood-mark and event evidence plotter
Plot bed levels, structures, thresholds and timed observations along a reach on a common vertical datum.
Assessment record
Replace all example numbers and identify their survey or event source. Use metres on one vertical datum. Enter each observation separately. Chainage increases downstream. Give each point a label, feature type, level, uncertainty and time with time zone where known. Use “unknown” for an undated peak mark. Avoid commas inside labels.
Survey and event inputs
Results and plots
Free screening tool. The assessor retains responsibility for the survey, assumptions and interpretation.
Method and sources
Bed, threshold, structure and water observations are plotted by downstream chainage on a common datum. Each water observation is a separate point with its stated vertical uncertainty; the plot does not join peaks into a water surface. Enter the time the level represents, which may differ from the survey or photograph time. The optional time filter matches equivalent instants and keeps static features. Record measurement method and timing uncertainty in the evidence notes. The plot supports interpretation; it cannot attribute the cause of flooding.