Slow the Flow

Ditch and watercourse conveyance calculator

Estimate flow at an observed level and at the first bank crest. Bring channel dimensions or a cross-section survey, a fall measured along the reach and evidence of vegetation and downstream water levels. Replace the example dimensions with site measurements before issuing the report.

Channel profile

Left and right are as viewed looking downstream. For survey points, start and finish at the bank crests. Use one vertical datum throughout. Equal offsets can represent a vertical wall.

Water level and gradient

Roughness and evidence

The three roughness values apply to the same geometry. Use a second profile to test sediment effects while keeping roughness and water level fixed.

Flow estimates

Free screening tool. The assessor retains responsibility for the survey, calculation assumptions and interpretation.

Method and sources

Manning’s equation in SI units: Q = (1/n) A (A/P)2/3 √S. A is wetted area, P is wetted bed and bank perimeter, S is energy slope and mean velocity is Q/A. The surveyed profile is interpolated in straight lines. Separate wetted portions are assumed to convey flow in parallel. The curves hold gradient and roughness constant up to the lower bank. They describe steady uniform in-bank flow.

Environment Agency, Fluvial Design Guide, chapter 8 – works in the river channel.

Environment Agency, Channel Management Handbook, table 2.2 – channel roughness ranges. Low, central and high represent the lower, recommended and upper coefficients. These are sensitivity bounds. Vegetation and irregularity can vary with season and flow depth.

Environment Agency, Channel conveyance assessment guidance – selecting a proportionate assessment.